
Basement Finishing
Finished Basement with Custom Built-Ins
An unfinished lower level turned into a full family living space with bespoke joinery and layered lighting.

Location
Indianapolis, IN
Project type
Bathroom Renovation
Completed
2024
A dated bathroom rebuilt from the waterproofing up into a calm, spa-style primary suite.
The existing bathroom had reached the point where patching no longer made sense, so the room was taken back to the studs.
Substrate, slope and waterproof membrane were all renewed before a single tile was set, because that is what determines whether a shower is still sound in fifteen years. Plumbing was reworked to suit the improved layout rather than forcing the new design around the old rough-in.
Marble tiling, frameless glass and carefully placed lighting finish a room that now feels considerably larger than its footprint suggests.
Every project on this page was measured, made and installed by the same team.

Basement Finishing
Finished Basement with Custom Built-Ins
An unfinished lower level turned into a full family living space with bespoke joinery and layered lighting.

Basement Finishing
Lower Level Family Room
A basement reworked into a bright, comfortable living area with a clear layout and warm finishes.